Gateway Bridge Duplication Project - ESC Services

GatewayLeighton Abigroup Joint Venture (LAJV) contracted CPESCs Ben Starr and Steve Dudgeon to develop rolling Erosion and Sediment Control Plans for the Gateway Bridge duplication and fourteen kilometres of approach road. 

The site presented a number of challenges including concurrent design / construct, a large linear site with multiple teams and a restricted construction footprint.

Existing controls were benchmarked, mapped on Autocad and discussed with each construction team to determine the proposed schedule of works in each discrete work area. These schedules were documented and staged erosion and sediment control plans were prepared and issued to each construction team.