Kareeya Control System Augmentation Project – Tully River

O2 provided a Hydrology Study associated with optimising power production at Koombooloomba and Kareeya hydropower stations on Tully River in Far North Queensland. The study was conducted in five stages comprising: data review, daily streamflow modelling and extension, simulation of reservoir operation and preparation of operating rules, flood frequency analysis, and hydrodynamic modelling for operational purposes.