ESC Plan for Arrow Energy

O2 was commissioned by Arrow Energy to prepare a Conceptual Erosion and Sediment Control Plan (CESCP) formultiple sites for gas pipeline construction and associated infrastructure in Queensland.

The first ROW in the Surat Basin was approximately 19.5km with a number of minor vand major water crossings. Works included pipe, dam, pilot areas including laydown areas and well pads.