Palmerston Stormwater Drainage Project

O2 was the Project Manager and Hydrologist for a detailed review of stormwater design flows and channel capacities for a grass lined trunk drainage system. This involved the use of the Regional Stormwater Model. Stage 2 of the study included remedial works design, design of retarding basins (using RSWM), and design of levees and other flood retaining structures (hydraulic analysis using the HEC 2 backwater program).